NINGBO XINLE 220 KV MAIN SUBSTATION————STOP WATER LEAKING INTO THE MAIN SUBSTATION?

Cable seal in Ningbo Xinle 220kv main substation project

CABLE SEALING HRK AND HRD

Cable seal in Ningbo Xinle 220kv main substation project

The current condition of the outside of Xinle 220kV substation.

Cable seal in Ningbo Xinle 220kv main substation project

The current condition of the inside of Xinle 220kV substation.

Cable seal in Ningbo Xinle 220kv main substation project

Use HRD200 to seal power cables and signal cables, as well as pre-drilled hole.

Cable seal in Ningbo Xinle 220kv main substation project

Use HRD 220/200-SGI-1/98 to seal power cables.

Cable seal in Ningbo Xinle 220kv main substation project

Use HRD 200-SG-3/6-54-4/6-26HRD 220/200-SGI-1/98 to seal power cables and signal cables.

Cable seal in Ningbo Xinle 220kv main substation project

Use HRK150-SSG-1/70-112 to seal power cabes.

Project information and solution provided by AMPdossen

PROJECT INFORMATION

Project?time
2021.05
Location169?Mujing?Road,High-tech?Zone,?Yinzhou?District,?Ningbo?City,?Zhejiang?Province
OwnerState?Grid?Zhejiang?Ningbo?Yinzhou?Power?Supply?Bureau
Installation?companyNingbo Transmission and Substation Construction Co., Ltd.

SOLUTIONS BY AMPdosse

SpecificationStandard cable sealing HRD200 and HRK 150, customized cable sealing HRD200.
The solutionIt is possible to effectively prevent water leakage in the manholes.
Products usedHRD 200-SGI-1/98
HRD 200-SG-3/6-54-4/6-26
HRK 200-SSG-1/110-162
HRK 150-SSG-1/70-112
HRK150-SSG-3/24-54
HRD 200-SG-7/10-32-8/3.5-16.5