BASF-YPC GAS TURBINE RETROFIT PROJECT————STOP WATER LEAKING INTO THE BASE OF THE GAS TURBINE?
CABLE SEALING SYSTEM HSI 150
Before the renovation, there was severe water leakage at the base of the gas turbine.
Use foam to seal the cables resulted in severe water leakage.
Use wall sleeve together with cable sealing HSI150 DG and HRD to seal power cables and signal cables
Use wall sleeve together with cable sealing HSI150 DG and HRD to seal power cables and signal cables
Use wall sleeve together with cable sealing HSI150 DG, HRD and Segmento to seal power cables and signal cables
Use wall sleeve together with cable sealing HSI150 DG, HRD and Segmento to seal power cables and signal cables
Project information and solution provided by AMPdossen
PROJECT INFORMATION
Project?time | 2020.12 |
Location | No.?222,?Yixi?Road,?Liuhe?District,?Nanjing |
Owner | BASF-YPC?Company?Limited |
Installation?company | Sinopec?Nanjing?Engineering?&Construction?Incorporation |
SOLUTIONS BY AMPdossen
Specification | Wall?insert,?cable?seal?and?connection |
The?solution | At?the?bottom?foundation?of?the?gas?turbine,?the?wall?sleeve?HSI?150-K2-Varia/200-260?is?embedded.?Then,?the?wall?sleeve?is?connected?with?conduit?external?connector?HSI?150-M110?and?168.?Finally,?the?cable?sealing?is?used?to?seal?the?power?cables?and?signal?cables. |
Products?used | HSI 150-K2-Varia/200-260 HSI 150-M110 HSI 150-M168 HSI 150-DG-1/36-70 HSI 150-DG-3/24-54 HSI 150-DG-6/10-36 HRD 150-SG-6/8-35 HRD 150-SG-9/6-25 HSI 150-S3 SEG 8/15 SEG 6/21 SEG3/26 SEG 2/31 HSI 150-D3/58 |